- All of the following are disadvantages of scheduling overtime EXCEPT
- A contractor finished a bridge across a lake 18 months early and received more than $6 million for the early completion. This is an example of reducing project duration caused by
- Because direct costs are assumed to be developed from “normal” methods and in a “normal” amount of time, any reduction in activity time should add to the costs of the activity.
- The cost slope of an activity is calculated by dividing the run by the rise.
- Insensitive networks are a rarity; Planning for a sensitive network is more practical.
- Which of the following correctly calculates an activity’s cost slope?
- Making the decision to crash is the result of careful fiscal analysis and deep understanding of the project.
- Crashing activities on a project network that is sensitive could increase the risk of the project being late.
- Managers have several effective methods for crashing specific project activities when resources are not constrained.
- Compressing activities on a project with a sensitive project network will:
- One of the advantages of using a project cost-duration graph is that it keeps the importance of indirect costs in the forefront of decision making.
- When it is necessary to reduce project duration and resources are constrained, which of the following is NOT a reasonable option?
- Before crashing, direct costs for an activity represent normal costs, which typically mean low-cost, efficient methods for completing the activity in a(n) ________ amount of time.
- Which of the following is NOT considered a project indirect cost?
- Shortening an activity’s duration is termed crashing.
- When the project team is salaried, which of the following is the preferred choice for accelerating project completion?
- When crashing an activity, you always crash to its crash point.
- The simplest way to reduce cost on a project is to reduce the scope of a project.
- The less steep the cost slope of an activity, the
- Brooks’ law states that adding manpower to a software project helps keep it on schedule.
- Which of the following is NOT a rational reason to reduce project duration?
- The relationship between the normal point and the crash point is assumed to be
- Crashing frequently results in over allocation of resources.
- Resources are frequently over-allocated when crashing a schedule.
- Which of the following is NOT one of the more commonly used options for cutting project costs?
- It is going to cost $80,000 a day simply to house and feed a construction crew in the farthest reaches of northern Alaska. This would be an example of a situation requiring reducing the project duration due to
- When reducing project duration, the duration for a project that is optimal is at the point where
- An activity’s crash cost includes ________ costs.
- Indirect costs generally represent overhead costs such as supervision, administration, consultants, and interest.
- Intense global competition and rapid technological advances create pressure to develop projects rapidly. This is an example of reducing project duration caused by